Sunday, January 17, 2010

The Last Piece of the Walls and SAR Training

Team Trades is very excited as they were able to put the last fibreglass piece onto the new building which means they will be onto the windows and sealing it all up. The panels are more than 1000kgs each and have a lot of fancy stuff inside them including carbon fibre sheets to discharge static electricity built up as the wind blows across the surfaces!

SAR Training this week was at the climbing wall and expeditioner's had to rope up for glacier travel and then prussic up and down the ropes. It was not always done with great ease!

No comments:

Post a Comment